SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear

Zamawiający
HOFOR Fjernvarme P/S
Opublikowano
2026-10-28
Termin
2026-11-27T13:00:00+00:00
Źródła
TED
Wartość
10000000.0 EUR

Opis

Opis jest w języku źródła.

The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). The procurement is divided into the following lots: Lot 1 – Power Transformers Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of power transformers, including cooling equipment, accessories, auxiliary, documentation and training. Lot 2 – 132 kV Gas Insulated Switchgear (GIS) Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of 132 kV SF6 Free Gas Insulated Switchgear, including associated local control cubicles, monitoring equipment, accessories, auxiliary, documentation and training. The detailed scope of each lot is described in the technical requirements and the contract documents.

CPV: 31000000, 31100000, 31170000, 31171000, 31172000, 31200000, 31213200, 31214000, 31214500, 31682540, 45315400, 45315700

Członkostwo

Przeglądaj podglądy bezpłatnie. Linki do oficjalnych ogłoszeń i dokumentów, pozwolenia na budowę oraz osobisty dostęp MCP wymagają aktywnego płatnego członkostwa.

Czytaj