Tenderfy

SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear

Pirkėjas
HOFOR Fjernvarme P/S
Paskelbta
2026-10-28
Terminas
2026-11-27T13:00:00+00:00
Šaltiniai
TED
Vertė
10000000.0 EUR

Aprašymas

Aprašymas pateikiamas šaltinio kalba.

The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). The procurement is divided into the following lots: Lot 1 – Power Transformers Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of power transformers, including cooling equipment, accessories, auxiliary, documentation and training. Lot 2 – 132 kV Gas Insulated Switchgear (GIS) Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of 132 kV SF6 Free Gas Insulated Switchgear, including associated local control cubicles, monitoring equipment, accessories, auxiliary, documentation and training. The detailed scope of each lot is described in the technical requirements and the contract documents.

CPV: 31000000, 31100000, 31170000, 31171000, 31172000, 31200000, 31213200, 31214000, 31214500, 31682540, 45315400, 45315700

Narystė

Peržiūrėkite skelbimo santrauką nemokamai. Oficialaus skelbimo ir dokumentų nuorodoms, statybos leidimams bei asmeninei MCP prieigai reikia aktyvios mokamos narystės.

Skaityti