Tenderfy

SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear

Hankija
HOFOR Fjernvarme P/S
Avaldatud
2026-10-28
Tähtaeg
2026-11-27T13:00:00+00:00
Allikad
TED
Väärtus
10000000.0 EUR

Kirjeldus

Kirjeldus on allika keeles.

The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). The procurement is divided into the following lots: Lot 1 – Power Transformers Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of power transformers, including cooling equipment, accessories, auxiliary, documentation and training. Lot 2 – 132 kV Gas Insulated Switchgear (GIS) Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of 132 kV SF6 Free Gas Insulated Switchgear, including associated local control cubicles, monitoring equipment, accessories, auxiliary, documentation and training. The detailed scope of each lot is described in the technical requirements and the contract documents.

CPV: 31000000, 31100000, 31170000, 31171000, 31172000, 31200000, 31213200, 31214000, 31214500, 31682540, 45315400, 45315700

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe