Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods
- Pasūtītājs
- Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownership
- Publicēts
- 2026-10-25
- Termiņš
- 2026-11-23T09:00:00+00:00
- Avoti
- TED
- Vērtība
- Nav norādīts
Apraksts
Apraksts ir avota valodā.
Services for inspection of the natural gas transmission system Zhidilovo–Skopje and the distribution pipeline Skopje South using in-line inspection (ILI), as well as inspection of the Deve Bair–Zhidilovo section (0–4 km) and the distribution pipelines Skopje North (1.8 km), Bunardzhik (5.4 km), Kumanovo (7.7 km), Kratovo (4.6 km) and Kriva Palanka (1.5 km) using non-destructive testing (NDT) methods, in accordance with the technical specification in the tender documentation.
CPV: 76600000
Dalība
Paziņojumu priekšskatījumi ir bez maksas. Saitēm uz oficiālajiem paziņojumiem un dokumentiem, būvatļaujām un personīgai MCP piekļuvei nepieciešama aktīva maksas dalība.
Lasīt