Tenderfy

Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods

Buyer
Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownership
Published
2026-10-25
Deadline
2026-11-23T09:00:00+00:00
Sources
TED
Value
Not provided

Description

The description is in the source language.

Services for inspection of the natural gas transmission system Zhidilovo–Skopje and the distribution pipeline Skopje South using in-line inspection (ILI), as well as inspection of the Deve Bair–Zhidilovo section (0–4 km) and the distribution pipelines Skopje North (1.8 km), Bunardzhik (5.4 km), Kumanovo (7.7 km), Kratovo (4.6 km) and Kriva Palanka (1.5 km) using non-destructive testing (NDT) methods, in accordance with the technical specification in the tender documentation.

CPV: 76600000

Membership

Read notice previews free of charge. Official notice and document links, construction permits and personal MCP access require an active paid membership.

Read