Tenderfy

Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods

Pirkėjas
Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownership
Paskelbta
2026-10-25
Terminas
2026-11-23T09:00:00+00:00
Šaltiniai
TED
Vertė
Nenurodyta

Aprašymas

Aprašymas pateikiamas šaltinio kalba.

Services for inspection of the natural gas transmission system Zhidilovo–Skopje and the distribution pipeline Skopje South using in-line inspection (ILI), as well as inspection of the Deve Bair–Zhidilovo section (0–4 km) and the distribution pipelines Skopje North (1.8 km), Bunardzhik (5.4 km), Kumanovo (7.7 km), Kratovo (4.6 km) and Kriva Palanka (1.5 km) using non-destructive testing (NDT) methods, in accordance with the technical specification in the tender documentation.

CPV: 76600000

Narystė

Peržiūrėkite skelbimo santrauką nemokamai. Oficialaus skelbimo ir dokumentų nuorodoms, statybos leidimams bei asmeninei MCP prieigai reikia aktyvios mokamos narystės.

Skaityti