Tenderfy

Upper Thurne 3 paketo statybos darbai

Pirkėjas
Broads (2006) Internal Drainage Board
Paskelbta
2026-10-16
Terminas
2027-01-19T12:00:00+00:00
Šaltiniai
UK_FTS
Vertė
6500000.0 GBP

Aprašymas

Aprašymas pateikiamas šaltinio kalba.

Broads IDB is planning to procure a Contractor for the design and construction of 2 x pumping stations and one culvert, namely Horse Fen pumping station and Somerton South pumping station and Somerton culvert. Each of these sites has an existing asset which will need to be decommissioned. Design for all sites principally consists of tasks as follows:- - Telemetry system - External lighting - Functional Design Specification and Human Machine Interface displays - Sensors and monitoring equipment - Stop log systems and non return gates valves, non return flap valves, penstocks and flow meters - Ducting and draw pits - Precast Concrete Components (outfall structures, pump support slabs and kiosk bases) - Motor Control Centre (MCC), kiosk trench support system and full electrical system design - Control kiosk including Heating, Ventilation and Air Conditioning (HVAC) and, fire and intruder alarm - Temporary works including relevant licenses, permissions and consents The Water Management Alliance (WMA) will oversee this procurement on behalf of the Broads Internal Drainage Board working with Turner & Townsend as advisors.

CPV: 45232150, 45232152, 45240000, 45252120, 45310000, 45351000, 71320000

Narystė

Peržiūrėkite skelbimo santrauką nemokamai. Oficialaus skelbimo ir dokumentų nuorodoms, statybos leidimams bei asmeninei MCP prieigai reikia aktyvios mokamos narystės.

Skaityti