Tenderfy

Upper Thurne Package 3 Construction Works

Hankija
Broads (2006) Internal Drainage Board
Avaldatud
2026-10-16
Tähtaeg
2027-01-19T12:00:00+00:00
Allikad
UK_FTS
Väärtus
6500000.0 GBP

Kirjeldus

Kirjeldus on allika keeles.

Broads IDB is planning to procure a Contractor for the design and construction of 2 x pumping stations and one culvert, namely Horse Fen pumping station and Somerton South pumping station and Somerton culvert. Each of these sites has an existing asset which will need to be decommissioned. Design for all sites principally consists of tasks as follows:- - Telemetry system - External lighting - Functional Design Specification and Human Machine Interface displays - Sensors and monitoring equipment - Stop log systems and non return gates valves, non return flap valves, penstocks and flow meters - Ducting and draw pits - Precast Concrete Components (outfall structures, pump support slabs and kiosk bases) - Motor Control Centre (MCC), kiosk trench support system and full electrical system design - Control kiosk including Heating, Ventilation and Air Conditioning (HVAC) and, fire and intruder alarm - Temporary works including relevant licenses, permissions and consents The Water Management Alliance (WMA) will oversee this procurement on behalf of the Broads Internal Drainage Board working with Turner & Townsend as advisors.

CPV: 45232150, 45232152, 45240000, 45252120, 45310000, 45351000, 71320000

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe