Reservoir North Urgent Structual Work
- Acheteur
- Newport City Council
- Publié
- 2026-11-26
- Échéance
- Non indiqué
- Sources
- UK_FTS
- Valeur
- Non indiqué
Description
La description est dans la langue de la source.
Urgent structural repairs to the bridge known as Structure No. 2937 Reservoir North on the unclassified road, Millbrook Lane, following significant settlement of the highway verge and blockage/failure of the culvert. Works include the removal of approximately 15m of surfacing, verges and camber; installation of a concrete slab; extension of the culvert headwall by 2m; repair and clearance of the culvert; and installation of fencing.
Abonnement
Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.
Lire