Tenderfy

Reservoir North Urgent Structual Work

Hankija
Newport City Council
Avaldatud
2026-11-26
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

Urgent structural repairs to the bridge known as Structure No. 2937 Reservoir North on the unclassified road, Millbrook Lane, following significant settlement of the highway verge and blockage/failure of the culvert. Works include the removal of approximately 15m of surfacing, verges and camber; installation of a concrete slab; extension of the culvert headwall by 2m; repair and clearance of the culvert; and installation of fencing.

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe