IMO Fire Door Works - Phase 1 Riser Doors
- Acheteur
- Department for Transport
- Publié
- 2026-11-16
- Échéance
- Non indiqué
- Sources
- UK_FTS
- Valeur
- Non indiqué
Description
La description est dans la langue de la source.
Fire Door Remedial Works – Phase 1 The works are summarised as follows: • Fire door repairs (30 doors) • Fire door replacements (61 doors) • Fire door survey of the doors within the scope of works • Associated making good around fire doors • Certification of all associated works in accordance with the employer’s requirements. The proposed works areas are stair cores and risers (Core A, B and C) The outline scope of works following the above contractors design portion shall comprise, but is not limited to, the following: • All repairs and replacement of fire doors The contractor is independently responsible for assessing the condition of all fire doors within the scope and ensuring that all works are completed in accordance with relevant standards and certification requirements. Contract Detail Notice
Abonnement
Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.
Lire