Tenderfy

IMO Fire Door Works - Phase 1 Riser Doors

Hankija
Department for Transport
Avaldatud
2026-11-16
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

Fire Door Remedial Works – Phase 1 The works are summarised as follows: • Fire door repairs (30 doors) • Fire door replacements (61 doors) • Fire door survey of the doors within the scope of works • Associated making good around fire doors • Certification of all associated works in accordance with the employer’s requirements. The proposed works areas are stair cores and risers (Core A, B and C) The outline scope of works following the above contractors design portion shall comprise, but is not limited to, the following: • All repairs and replacement of fire doors The contractor is independently responsible for assessing the condition of all fire doors within the scope and ensuring that all works are completed in accordance with relevant standards and certification requirements. Contract Detail Notice

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe