Swanwick Lodge Secure Unit - Lakeside Quiet Area Roof Refurbishment
- Acheteur
- Hampshire County Council
- Publié
- 2026-10-16
- Échéance
- Non indiqué
- Sources
- UK_FTS
- Valeur
- Non indiqué
Description
La description est dans la langue de la source.
Alteration to the front section of a flat roof (approx. 1.5m) which currently back falls into a box gutter with internal drainage. The falls to the front 1.5m will be changed so that all rainwater drains to the perimeter. This will involve forming new fascia / soffit and installing new rainwater goods. The whole roof will receive a new liquid applied waterproof membrane (Bauder PMMA). The work will also involve installing new underground storm drainage and connection to existing infrastructure.
Abonnement
Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.
Lire