Swanwick Lodge Secure Unit - Lakeside Quiet Area Roof Refurbishment
- Comprador
- Hampshire County Council
- Publicado
- 2026-10-16
- Plazo
- No indicado
- Fuentes
- UK_FTS
- Valor
- No indicado
Descripción
La descripción está en el idioma de la fuente.
Alteration to the front section of a flat roof (approx. 1.5m) which currently back falls into a box gutter with internal drainage. The falls to the front 1.5m will be changed so that all rainwater drains to the perimeter. This will involve forming new fascia / soffit and installing new rainwater goods. The whole roof will receive a new liquid applied waterproof membrane (Bauder PMMA). The work will also involve installing new underground storm drainage and connection to existing infrastructure.
Suscripción
Consulte gratis el resumen de cada anuncio. Los enlaces al anuncio oficial y sus documentos, los permisos de construcción y el acceso MCP personal requieren una suscripción de pago activa.
Leer