Silverwood Borehole Design and Build
- Acheteur
- MINING REMEDIATION AUTHORITY
- Publié
- 2026-11-10
- Échéance
- 2026-10-23T11:00:00+00:00
- Sources
- UK_CF
- Valeur
- 3906845.25 GBP
Description
La description est dans la langue de la source.
The Authority has requirement for a Borehole to be drilled on the site of the old Silverwood Pit, Rotherham South Yorkshire to monitor the rising mine water in the Maltby block. A two Stage, Design and Build Borehole project has been Awarded to Balfour Beatty. This notice is intended to inform that a Call off from the SCAPE Civil Engineering Framework has taken place.
CPV: 45120000
Abonnement
Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.
Lire