Tenderfy

Silverwood Borehole Design and Build

Hankija
MINING REMEDIATION AUTHORITY
Avaldatud
2026-11-10
Tähtaeg
2026-10-23T11:00:00+00:00
Allikad
UK_CF
Väärtus
3906845.25 GBP

Kirjeldus

Kirjeldus on allika keeles.

The Authority has requirement for a Borehole to be drilled on the site of the old Silverwood Pit, Rotherham South Yorkshire to monitor the rising mine water in the Maltby block. A two Stage, Design and Build Borehole project has been Awarded to Balfour Beatty. This notice is intended to inform that a Call off from the SCAPE Civil Engineering Framework has taken place.

CPV: 45120000

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe