Energieverbund Goldach: Energiezentrale
- Hankija
- Politische Gemeinde Goldach, vertreten durch Technische Betriebe Goldach
- Avaldatud
- 2026-11-11
- Tähtaeg
- 2026-12-23T22:59:00+00:00
- Allikad
- CH_SIMAP
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
<p>The Regional Water Supply St. Gallen (RWSG) is currently constructing the new Riet II lakewater plant. As part of this project, the municipality of Goldach has the opportunity to make use of the new lake water intake and thereby establish a thermal network providing. Using large-scale heat pumps, lake water can be utilized as a renewable energy source to provide environmentally friendly heating for households, public buildings and commercial premises.</p><p>The project is divided into two sub-projects:</p><p>Sub-project 1 – Energy Centre</p><p>Sub-project 2 – Distribution Network</p><p> </p><p>The contract covers SIA sub-phases 32 (construction project) to 53 (commissioning) for sub-project 1 – Energy Centre.</p><p> </p><p>The general planner’s mandate comprises the following services and specialist areas:</p><p>- Overall management and coordination of specialist areas (including construction management)</p><p>- Chief site management</p><p>- BIM management</p><p>- Civil engineering, including specialised civil engineering</p><p>- Building construction/structural engineering</p><p>- Piping (heating/cooling), including building connections</p><p>- Architecture</p><p>- Landscape architecture</p><p>- Fire protection</p><p>- Plant engineering</p><p>- HVAC</p><p>- Electrical and low-voltage systems</p><p>- Building automation</p><p>- Building physics</p><p>- Geology</p>
CPV: 71000000, 71320000, 71356000
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe