Tenderfy

Energieverbund Goldach: Energiezentrale

Comprador
Politische Gemeinde Goldach, vertreten durch Technische Betriebe Goldach
Publicado
2026-11-11
Plazo
2026-12-23T22:59:00+00:00
Fuentes
CH_SIMAP
Valor
No indicado

Descripción

La descripción está en el idioma de la fuente.

<p>The Regional Water Supply St. Gallen (RWSG) is currently constructing the new Riet II lakewater plant. As part of this project, the municipality of Goldach has the opportunity to make use of the new lake water intake and thereby establish a thermal network providing. Using large-scale heat pumps, lake water can be utilized as a renewable energy source to provide environmentally friendly heating for households, public buildings and commercial premises.</p><p>The project is divided into two sub-projects:</p><p>Sub-project 1 – Energy Centre</p><p>Sub-project 2 – Distribution Network</p><p>&nbsp;</p><p>The contract covers SIA sub-phases 32 (construction project) to 53 (commissioning) for sub-project 1 – Energy Centre.</p><p>&nbsp;</p><p>The general planner’s mandate comprises the following services and specialist areas:</p><p>-&nbsp;&nbsp;&nbsp;Overall management and coordination of specialist areas (including construction management)</p><p>-&nbsp;&nbsp;&nbsp;Chief site management</p><p>-&nbsp;&nbsp;&nbsp;BIM management</p><p>-&nbsp;&nbsp;&nbsp;Civil engineering, including specialised civil engineering</p><p>-&nbsp;&nbsp;&nbsp;Building construction/structural engineering</p><p>-&nbsp;&nbsp;&nbsp;Piping (heating/cooling), including building connections</p><p>-&nbsp;&nbsp;&nbsp;Architecture</p><p>-&nbsp;&nbsp;&nbsp;Landscape architecture</p><p>-&nbsp;&nbsp;&nbsp;Fire protection</p><p>-&nbsp;&nbsp;&nbsp;Plant engineering</p><p>-&nbsp;&nbsp;&nbsp;HVAC</p><p>-&nbsp;&nbsp;&nbsp;Electrical and low-voltage systems</p><p>-&nbsp;&nbsp;&nbsp;Building automation</p><p>-&nbsp;&nbsp;&nbsp;Building physics</p><p>-&nbsp;&nbsp;&nbsp;Geology</p>

CPV: 71000000, 71320000, 71356000

Suscripción

Consulte gratis el resumen de cada anuncio. Los enlaces al anuncio oficial y sus documentos, los permisos de construcción y el acceso MCP personal requieren una suscripción de pago activa.

Leer