INSTALLATION OF TWO SEPARATE MODULAR INDOOR GOLF SIMULATORS CABINS AT PRIORS HALL GOLF COURSE.
- Zamawiający
- North Northamptonshire Council
- Opublikowano
- 2026-11-26
- Termin
- Nie podano
- Źródła
- UK_FTS
- Wartość
- Nie podano
Opis
Opis jest w języku źródła.
The scope for this project is to design, plan and install all aspects of the two indoor golf simulators set out in the specification, managing the project from start to finish to provide a turnkey solution. 3.1. This contract will be awarded on the basis of Most Advantageous Bid based on the evaluation criteria detailed in Annex 1 of this document. - All aspects of the project specification must be delivered by the supplier as one turnkey solution. - Your service team must have a qualified electrician present for all electrical works and testing. - Your team must be appropriately trained in line with industry standards for all work completed as part of the project. - A service manager or a[RJ1.1][AS1.2]n employee with the equivalent responsibility must be present throughout the duration of the service and be responsible for the co-ordination of a preservice works meeting and a post service works meeting. - For companies to be considered you must be able to demonstrate you are a competent and experienced company able to supply and install indoor golf simulators and all associated technology and equipment at Priors Hall Golf Course. The primary objective of this procurement is to ensure the indoor golf simulators are installed to the highest possible standard and operates optimally. - The company will be responsible for providing all necessary labour, materials, and equipment required to carry out the project. - Companies will be required to install the latest Foresight Falcon launch monitor technology along with all associated equipment and materials available, in line with industry standards, which are detailed in the specification. A) Plan and design the installation of two separate indoor login cabin golf simulators each with an internal measurement of 4.5m x 6.6m (29.7sqm) and a apex roof height of 3.6m. B) The log cabin structures are to be treated following installation with an appropriate substance and set on a timber sub frame base with composite posts and cover boards for the base. C) Each log cabin is required to have roof insulation and guttering installed, along with a double-glazed double doors. D) Supply and installation of all flooring required, including hitting mat and surrounding wooden flooring and matting. E) Supply and Installation of all internal electrics required to supply power for lighting, plug sockets and all golf simulators related equipment. F) Installation of all golf simulator technology equipment, including; Foresight Falcon Launch monitor, 4k laser 6000 lumen projector, 4K Gaming PC, 43" touchscreen monitor, soundbar. G) Installation of and additional lighting, fixtures and fittings as agreed. H) Installation of projector screen. I) Provide an Electrical installation certificate following completion of all internal re-wiring. J) 6 months warranty on all aspects of the installation, excluding all golf simulator technology as this will be provided separately. K) Liaise with goods suppliers to manage deliveries of to site and provide any further warranties as required. Interested companies must submit a proposal that includes the following: A) A detailed description of the proposed approach to the work. B) A breakdown of all costs, including labour, materials, and any other charges. C) Evidence of relevant experience and qualifications. D) References from previous clients. E) Availability to commence work within 12 weeks of the award of the contract as agreed between North Northants Council and the successful company. Submitted proposals will be evaluated based on the following criteria: A) Experience and qualifications of the contractor. B) Quality and suitability of the proposed approach to the work. C) Cost-effectiveness of the proposal. D) Availability to commence work within 16 weeks of the award of the contract as agreed between the council and the successful company.[RJ2.1] E) References from previous clients. F) One principal contractor who is able to provide a turnkey solution.
Członkostwo
Przeglądaj podglądy bezpłatnie. Linki do oficjalnych ogłoszeń i dokumentów, pozwolenia na budowę oraz osobisty dostęp MCP wymagają aktywnego płatnego członkostwa.
Czytaj