Tenderfy

ED0425-26 Ottery St Mary Weir Repairs and Desilt

Zamawiający
East Devon District Council
Opublikowano
2026-10-28
Termin
Nie podano
Źródła
UK_FTS
Wartość
Nie podano

Opis

Opis jest w języku źródła.

East Devon District Council (EDDC) abstracts water for the Mill Leat (“the Leat”) from the River Otter at the Head Weir, located upstream of Ottery St Mary. The abstraction is controlled by a weir at the upstream end of the Mill Leat (“the Weir”). Deterioration of the Weir structure has resulted in flows bypassing the crest, leading to inadequate water levels in the River Otter for the adjacent Head Weir fish pass and eel pass to function effectively. The proposed works comprise the removal and replacement of the existing Weir structure, together with maintenance dredging of the Leat. The Contractor shall be responsible for obtaining all relevant Environmental Permits.

Członkostwo

Przeglądaj podglądy bezpłatnie. Linki do oficjalnych ogłoszeń i dokumentów, pozwolenia na budowę oraz osobisty dostęp MCP wymagają aktywnego płatnego członkostwa.

Czytaj