Construction of New Railway Section from Kriva Palanka to the Border of the Republic of Bulgaria, as part of Corridor VIII
- Zamawiający
- Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI)
- Opublikowano
- 2026-09-23
- Termin
- 2027-01-20T11:00:00+00:00
- Źródła
- TED
- Wartość
- Nie podano
Opis
Opis jest w języku źródła.
The Contract covers the detailed design and construction of approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, forming Section 3 of Railway Corridor VIII – Eastern Section. The railway will have a maximum design speed of 100 km/h. The Works include Kriva Palanka station, Zidilovo halt/station, 21 tunnels with a total length of approximately 8.5 km, 51 bridges/viaducts with a total length of approximately 5 km, permanent way, earthworks, drainage, retaining structures, access roads and associated civil and interface works. The cross-border tunnel and its functional area are excluded from this Contract.
CPV: 45234100
Członkostwo
Przeglądaj podglądy bezpłatnie. Linki do oficjalnych ogłoszeń i dokumentów, pozwolenia na budowę oraz osobisty dostęp MCP wymagają aktywnego płatnego członkostwa.
Czytaj