Framework for Supply and Install of Fibre Optic Infrastructure Associated Works, Maintenance and Testing
- Pasūtītājs
- Durham County Council
- Publicēts
- 2026-11-16
- Termiņš
- Nav norādīts
- Avoti
- UK_FTS
- Vērtība
- Nav norādīts
Apraksts
Apraksts ir avota valodā.
Framework for Supply and Install of Fibre Optic Infrastructure Associated Works, Maintenance and Testing Works and Services under this framework will involve the following (please note the below list is not exhaustive and the Council reserves the right to add required works to call offs: Installation of cat6 / cat6a copper data cabling either internally or externally. This will be terminated to either a patch panel in a network cabinet or a data outlet on a wall / ceiling. Other termination points may be required occasionally. Data ports at both ends will be labelled and the cable run will be tested for spec using BIT error rate testing, with the results being provided by e-mail to an allocated officer before the Contractor leaves site if it is a repair or within 5 working days if it is a new installation. Installation of fibre optic data cabling either internally or externally to a required building. This will usually be terminated to either a patch panel in a network cabinet using fibre splicing techniques or a data outlet on a wall / ceiling. Fibre ports at both ends will be labelled and the cable run will be tested using a TDR, with the results being provided by e-mail to the Councils designated Officer. The above would be done in a number of locations including but not limited to: Inspection pits outside, in all weathers. Inside of a building from the network cabinet to numerous locations around the office. Inside of a building from the network cabinet to network cabinet. In the roof space of a building, often in cramped and confined spaces. In hazardous locations such as on high roofs, on gantries high above swimming pools / halls, roadside etc. Fitting of network cabinets, wall / floor trunking, galvanised steel cable trays and other associated cable management structures. Swapping network cabinets after hours with larger units. This will involve carefully removing existing network kit and patch panels, removing the old network cabinet and disposing of it, re-fitting all the existing patch panels and networking kit into the new cabinet. Network connectivity will then need to be checked to ensure network is back online. Remedial works such as patching walls, small amounts of plastering, repair fire stop sealants to the required standard following cabling. Fitting of fused spurs to the mains electric to power the network cabinets. Installation and configuration of point-to-point wireless equipment to provide network links wirelessly over distances between 1 - 25 miles. This will involve the installation of wireless radio's either on the roof of a building or a high gable end. Alignment of said radios to match with the partner radio at the other location. Running of external grade cat6 / cat6a cable from the network cabinet to the radio at either end. The Contractor may be required to work at height and shall provide and use appropriate access equipment where necessary, including ladders, mobile elevated work platforms (MEWPs), cherry pickers, scissor lifts, or similar equipment. All work at height must be carried out in accordance with current health and safety legislation and best practice. The Contractor must consider the potential presence of asbestos-containing materials (ACMs) within Durham County Council buildings. Prior to undertaking any works that could disturb the building fabric, the Contractor shall review relevant asbestos information provided by the Council and ensure that no asbestos-containing materials are damaged or disturbed during the installation, maintenance, or testing of fibre optic infrastructure. Any concerns regarding the presence of asbestos must be raised with the Council before works commence. Some work will require the use of ladders, manlift, cherry picker, etc. Have the necessary resource to undertake urgent repairs to either cat6 / fibre optic cabling at short notice (within 2 hours) and potentially out of hours / weekend within the same timescales) Have the necessary resource to undertake works at short notice (1 - 2 weeks lead time).
Dalība
Paziņojumu priekšskatījumi ir bez maksas. Saitēm uz oficiālajiem paziņojumiem un dokumentiem, būvatļaujām un personīgai MCP piekļuvei nepieciešama aktīva maksas dalība.
Lasīt