Tenderfy

GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure

Pasūtītājs
Guildford Borough Council
Publicēts
2026-10-23
Termiņš
Nav norādīts
Avoti
UK_FTS
Vērtība
Nav norādīts

Apraksts

Apraksts ir avota valodā.

The Works The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots. In summary, the Works under this Contract will comprise: • Necessary surveys, and investigations and monitoring. • Demolition of remaining buildings (including the existing Guildford Council Depot) • Vegetation clearance, tree felling and site strip • Topsoil stripping • Sitewide remediation of contamination (where required) • Site platform and levelling • Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors • Swales and attenuation basins • Surface water outfalls • Utility infrastructure, ducting, chambers, pipework • Highway formations • Signage, markings, street furniture, street lighting • Non-motorised Vehicles works, encompassing various pedestrian and cycle path improvements • S278 Junction Works • Maintain the reptile translocation fencing and associated inspections Location Location of Project: • Area named Phase 1: Weyside Urban Village (Slyfield regeneration Programme), Land to the south of Bellfield Allotments, Guildford, GU1 1QG. • Area named Phase 3: Weyside Urban Village (Slyfield regeneration Programme), existing Guildford Borough Council’s Depot site, Guildford GU1 1QE. • Area named NMU: Farm Close, Section 106 ref 6, Mangles Road Section 106 ref 10.4 and Towpath improvements section 106 ref 8-9 Works by Others During these works there are likely to be the following works being undertaken by the Employer and statutory undertakers on and or around the site, including but not limited to; • Ground water monitoring. • Other works may be occurring adjacent to the site on the wider master site plan. • Ecological watching brief by an independent ecologist • Archaeological watching brief by an independent archaeologist • Utilities works / diversions (which do not form part of the Scope of these works). • General s278 Highways works • Works associated with the relocation of the Sewerage Treatment Works • Off site demolitions

Dalība

Paziņojumu priekšskatījumi ir bez maksas. Saitēm uz oficiālajiem paziņojumiem un dokumentiem, būvatļaujām un personīgai MCP piekļuvei nepieciešama aktīva maksas dalība.

Lasīt