Tenderfy

Didžiosios salės tiltas, Aleksandros rūmai

Pirkėjas
London Borough of Haringey
Paskelbta
2026-10-30
Terminas
2026-11-27T00:00:00+00:00
Šaltiniai
UK_FTS
Vertė
850000.0 GBP

Aprašymas

Aprašymas pateikiamas šaltinio kalba.

The project is to regenerate the use of the Great Hall Bridge through improving waterproofing and ensuring compliance with Building Regulations. Through these interventions, the project will allow for members of the public to use the bridge both as access to the Great Hall, which hosts some of the most significant events for the Palace, and as a means of escape therefore safety is paramount. The proposed works are to be carefully integrated within the existing structure and building services infrastructure, ensuring compliance with current Building Regulations and statutory requirements while safeguarding the listed fabric, preserve the architectural integrity of the building, minimise disruption to public events, and ensure continuous functionality for critical life-safety systems and venue operations.

CPV: 45000000, 45200000, 45210000, 45212000, 45212300, 45212350, 45212351, 45212352, 45212353, 45212354, 45217000

Narystė

Peržiūrėkite skelbimo santrauką nemokamai. Oficialaus skelbimo ir dokumentų nuorodoms, statybos leidimams bei asmeninei MCP prieigai reikia aktyvios mokamos narystės.

Skaityti