Asset Identification and Build-Over CCTV Sewer Survey - RFI
- Committente
- Southern Water Services Limited
- Pubblicato
- 2026-11-25
- Scadenza
- Non indicato
- Fonti
- UK_FTS
- Valore
- 0.0 GBP
Descrizione
La descrizione è nella lingua della fonte.
Southern Water requires a contractor to undertake CCTV sewer surveys in support of Build-Over Agreement applications across the Southern Water’s operating area (Sussex, Hampshire and Kent; excluding Isle of Wight). The service supports Developer Services in assessing the impact of proposed developments on public sewerage assets and determining any conditions required before approval can be granted. Southern Water intends to appoint a single supplier to undertake Build-Over CCTV surveys and provide minor jetting works where necessary to facilitate survey completion. The new contract is expected to commence before expiry of the current agreement on 21st of March 2027 and will be awarded for an initial term of three years, with extension options of up to five years to align with AMP planning periods. The estimated volumes are 75 surveys per month. As an ongoing operational requirement, a long-term contractual solution is needed to ensure service continuity, maintain customer satisfaction, and support the objectives of Developer Services. Given the direct impact of service performance on customer outcomes and D-MeX measures, service quality will remain a key procurement and contract management priority. SCOPE AND KEY ACTIVITIES Scope For each Full Build-Over (SN18) application, a full WINCAN CCTV survey is required to establish the condition, material type, location and depth of public sewers located within, beneath, or adjacent to the proposed development. Survey outputs enable Southern Water to determine whether remedial works are required before approval can be granted. Typical requirements may include the replacement or repair of defective sewers or assets constructed from pitch fibre or plastic materials. The service shall include the production of a detailed WINCAN survey report incorporating: Annotated site drainage layouts and measurements. Sewer depth, diameter and material information. Measurements between sewer assets and existing or proposed structures. Site photographs demonstrating sewer locations, property layout and any works in progress. Evidence of access constraints or safety issues affecting survey completion. Identification of public sewer assets and assets crossing property boundaries. Key activities Work requests will be issued by Southern Water using a standardised request form containing relevant applicant details, customer contact information, and details of the proposed development. The supplier will be responsible for arranging appointments directly with applicants and homeowners and maintaining regular communication with the Build-Over team throughout service delivery. Stakeholder engagement will primarily be limited to Southern Water personnel and the applicants concerned. PROPOSED TENDER STRUCTURE Current strategy assumes this procurement will be run as a single stage tender under Procurement Act 2023 with PSQ (Procurement Specific Questionnaire; Condition of Participation; Pre-Qualification Questionnaire) and ITT (Invitation to Tender) to be issued to bidders concurrently. PSQ will assess basic supplier’s capability and capacity and will include pass/fail question. ITT will consist of Technical and Commercial envelopes.
CPV: 90490000, 90491000
Abbonamento
Leggi gratuitamente le anteprime. I collegamenti ai bandi ufficiali e ai documenti, i permessi edilizi e l’accesso MCP personale richiedono un abbonamento a pagamento attivo.
Leggi