HVAC concept-level study
- Committente
- UK FUSION ENERGY LTD
- Pubblicato
- 2026-11-19
- Scadenza
- Non indicato
- Fonti
- UK_FTS
- Valore
- Non indicato
Descrizione
La descrizione è nella lingua della fonte.
UKFE has appointed a supplier on a services contract to provide a study for concept designs of Heating, Ventilation and Air Conditioning (HVAC) within the Tokamak building to be built at West Burton Power Station. UK Fusion Energy Ltd (UKFE) is a wholly owned subsidiary of the UK Atomic Energy Authority (UKAEA) Group, responsible for the STEP (Spherical Tokamak for Energy Production) programme to deliver the UK’s prototype fusion energy plant. Targeting first operations in 2040, UKFE will lead STEP’s integrated delivery team to design and build the prototype fusion energy plant at West Burton, a former coalfired power station site in Nottinghamshire.
Abbonamento
Leggi gratuitamente le anteprime. I collegamenti ai bandi ufficiali e ai documenti, i permessi edilizi e l’accesso MCP personale richiedono un abbonamento a pagamento attivo.
Leggi