Replacement of roof at Moorwell Waste Management Facility
- Acheteur
- Council of the Isles of Scilly
- Publié
- 2026-11-26
- Échéance
- Non indiqué
- Sources
- UK_FTS
- Valeur
- 250000.0 GBP
Description
La description est dans la langue de la source.
The Council of the Isles of Scilly intends to procure a contractor to undertake the replacement of the existing roof covering to the Waste Processing Hall at the Moorwell Waste Management Facility, St Mary's, Isles of Scilly. The project will involve the design (where required), supply, delivery and installation of a replacement roofing system incorporating fibre cement roofing sheets and associated roof components. The replacement roof shall be designed and constructed to: • Provide a durable weatherproof roof covering suitable for a marine environment. • Achieve a minimum design life of 30 years. • Incorporate fibre cement roof sheets and associated flashings, fixings and accessories. • Be structurally capable of supporting a roof-mounted solar photovoltaic (PV) installation. • Include adequate load-bearing capacity for maintenance personnel and safe access equipment. • Incorporate compliant fall-protection measures and roof access arrangements. • Meet all relevant Building Regulations and Health and Safety requirements. • Minimise disruption to the ongoing operation of the waste management facility.
CPV: 45260000
Abonnement
Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.
Lire