Tenderfy

Roof Improvement Works at Parkwood Industrial Estate - Wren and Phoenix

Acheteur
Maidstone Borough Council
Publié
2026-11-19
Échéance
Non indiqué
Sources
UK_FTS
Valeur
Non indiqué

Description

La description est dans la langue de la source.

Maidstone Borough Council is looking to procure a Main Contractor to carry out the over cladding to the existing roofs at Units 1-11 at Phoenix Park Industrial Estate and 1-16 at Wren Industrial Estate. The scope also includes the redecoration of the existing cladding panels as described in drawings. There are several single glazed windows to be upgraded to double glazing and several roller shutter doors to be replaced as specified in the drawings.

Abonnement

Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.

Lire