Tenderfy

Travaux de création d’une crèche au sein de l’école, école maternelle Berry Hill, école primaire Broadlea, île de Wight.

Acheteur
Isle of Wight Council
Publié
2026-10-27
Échéance
2026-11-20T14:00:00+00:00
Sources
UK_FTS
Valeur
147550.0 GBP

Description

La description est dans la langue de la source.

This work package is to be undertaken at Broadlea Primary School, Newport Road, Sandown, Isle of Wight, PO36 9PE, for the schools pre-school (Berry Hill Childcare). The project works are to include the internal alteration and refurbishment of the internal floor space of the rear school (north) block, to include some fire door replacement works and other general builders works. In addition, the project works will include internal minor reconfiguration of the existing classrooms and internal refurbishment of the proposed baby / toddler class spaces which includes optional alterations to WC and washroom facilities, all as described on drawing numbers: - DWG.No; LAK/02/01 - P7 - 004 WC Refurbishment Works - OPTION 1 - DWG.No; LAK/02/01 - P7 - 005 WC Refurbishment Works - OPTION 2 These improvement works are a requirement to satisfy the functionality of the spatial concerns with the present design, but subject to available budget.

CPV: 45000000

Abonnement

Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.

Lire