Lancaster Sustainment: Flapjack Assembly
- Acheteur
- Defence Equipment and Support
- Publié
- 2026-10-20
- Échéance
- Non indiqué
- Sources
- UK_FTS
- Valeur
- Non indiqué
Description
La description est dans la langue de la source.
The Authority has a requirement for the provision of services for the design and production of the BBMF Lancaster aircraft hydraulic flapjack part, quantity two.The Lancaster aircraft is currently undergoing maintenance. One hydraulic flapjack must be provided by November 2026, and the second by June 2027.This contract contains core work, for the provision of the hydraulic flapjack cylinder and end cap (FJC + EC), and an option, for the additional cost for the provision of the entire hydraulic flapjack unit (FJA). The Authority will determine whether this option shall be exercised after contract award.The supplier for this work must be compliant with the technical requirements set out in the ITT.
Abonnement
Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.
Lire