Tenderfy

Alternative Active Effluent Discharge Line Installation Works and Final Design

Acheteur
Nuclear Restoration Services
Publié
2026-11-05
Échéance
2026-08-18T11:00:00+00:00
Sources
UK_CF
Valeur
9458845.02 GBP

Description

La description est dans la langue de la source.

The Cooling water system at NRS Hunterston B site is no longer required for any cooling function. Therefore, the intention is to remove the Cooling Water pumps and there is a requirement to provide Alternative Active Effluent Discharge Lines (AAEDL) to the sea discharge point. This contract is for final concept design services and the marine installation of new pipe, valve and other minor works for the AAEDL seaward side, at the Hunterston B Nuclear site. This is to include: - End of line isolation and backflow protection - Culvert fixings - Pipe fitting and valve repair/replacement/installation - Pressure testing and maintenance strategy - Any required pre-works The Contract has been awarded via Mini-Competition under the NRS Decommissioning and Asbestos Removal (DAR) Framework Lot 1 - conventional deplanting, asbestos removal and demolition.

CPV: 45231000, 45251000

Abonnement

Consultez gratuitement les aperçus. Les liens vers les avis officiels et leurs documents, les permis de construire et l’accès MCP personnel nécessitent un abonnement payant actif.

Lire