North Wooton Pump and Pre-Cast Concrete Units Supply
- Hankija
- Kings Lynn Internal Drainage Board
- Avaldatud
- 2026-11-25
- Tähtaeg
- Pole esitatud
- Allikad
- UK_FTS
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of two pumps and pre-cast concrete units (PCCU) that form the pump sump, support and inlet structure for the new pumping station for the North Wootton pumping station replacement project. The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design heads. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage. The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for North Wootton pumping station. This includes Design, Testing and providing the required information for the Health and Safety File and Operations and Maintenance Manual. The Water Management Alliance (WMA) will oversee this procurement on behalf of the King's Lynn Internal Drainage Board working with Turner & Townsend as advisors.
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe