Tenderfy

Autumn Response Teams Framework

Hankija
NETWORK RAIL INFRASTRUCTURE LIMITED
Avaldatud
2026-11-23
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

Linked to - ocds-h6vhtk-069bb1 - System not allowing linking Autumn Response Teams (ART) provide proactive and reactive mitigation to manage low adhesion risk, protect operational safety, and improve overall network performance. Autumn is historically one of the most challenging seasons for railway operations due to railhead contamination caused primarily by leaf fall. Compacted leaf matter significantly reduces wheel–rail adhesion, increasing the risk of Signals Passed at Danger (SPADs), station over-runs, braking performance issues, and consequential service disruption.

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe