Tenderfy

14662 - Berkeley Primary School - BMS Control Panel

Hankija
North Lincolnshire Council
Avaldatud
2026-11-18
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

Boiler and BMS Control Panel Works - The project is time-critical and must be completed before the winter period to maintain the effective operation of the school's building management system. The proposed programme includes undertaking elements of the works during the October half-term and through weekend working to minimise disruption to the school

CPV: 45210000

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe