Georgeham CLT
- Hankija
- ASTER GROUP LIMITED
- Avaldatud
- 2026-11-13
- Tähtaeg
- Pole esitatud
- Allikad
- UK_FTS
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
The design, construction and completion of 19nr residential dwellings, to Passivhaus Certified standard, together with alterations to an existing adopted road, external works, off-site services connections, landscaping and the like, on a sloping greenfield site. In addition, the works include provision of two serviced plots ready for con-current construction by others.
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe