Sir Roger Manwoodi kool – Grange Sixth Formi renoveerimine
- Hankija
- SIR ROGER MANWOOD'S SCHOOL
- Avaldatud
- 2026-11-16
- Tähtaeg
- 2026-12-13T23:59:00+00:00
- Allikad
- UK_FTS
- Väärtus
- 1550000.0 GBP
Kirjeldus
Kirjeldus on allika keeles.
Refurbishment and alterations to an existing building to create a sixth form centre. The Tenderer must submit the following as part of their first stage tender submission:- 1st Stage Tender • Priced copy of the Contract Sum Analysis (see Section Nr 6) with fully priced preliminaries book (fixed and time-related items) and overheads and profit only (refer to Appendix C2 for pricing requirements) • Fees, overheads and profit between Stage 1 and 2 tender (if required) • Construction programme detailing the works required to complete the project • Budget cost for the construction works - providing commentary and comparison to the elemental budget figures provided within Section Nr. 6 2nd Stage Tender Following the 1st Stage, the intention is that a single contractor will be invited to negotiate a final contract sum based on the RIBA 4 design information . However, the Employer reserves the right to approach more than one contractor during the second stage.
CPV: 45000000
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe