Fountain Lake Jetty - Main Works Contract
- Hankija
- Defence Infrastructure Organisation
- Avaldatud
- 2026-11-12
- Tähtaeg
- Pole esitatud
- Allikad
- UK_FTS
- Väärtus
- 500000000.0 GBP
Kirjeldus
Kirjeldus on allika keeles.
Scope of Services and Deliverables: The project comprises of the full regeneration of the complete Fountain Lake Jetty. The key construction activities are divided into 4 phases and include following: Phases 1 and 2 comprise FLJ East, at approximately 375m long. Phase 1 covers the enabling works, such as the re-routing of services, strengthening of impounding wall area including height raising and provision of access route, while Phase 2 covers the demolition of the existing jetty, construction of the new jetty, and associated dredging. Phases 3 and 4 comprise FLJ West, at approximately 275m. Phase 3 covers the enabling works, such as the re-routing of services, strengthening of impounding wall area including height raising and provision of access route, while Phase 4 covers the demolition of the existing jetty, construction of the new jetty, and associated dredging. The Contractor provides technical support to the Project Manager to support the evaluation and selection of a preferred solution for all phases of Works and in preparing the design ahead of the four phases of work, as noted above, and achieving the Marine Licence which facilitates works commencing on the West section. This procurement will be open to all NATO countries following NCB+ procedures.
CPV: 45244000
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe