Tenderfy

Building Management System Upgrade to Ysbyty George Thomas Hospital

Hankija
Cwm Taf Morgannwg University Health Board
Avaldatud
2026-11-03
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

Direct award call-off under the SBS10166 Hard Facilities Management 2 Framework Lot 1.1 Building Management Systems for the upgrade of the Building Management System (BMS) at Ysbyty George Thomas (YGT) Hospital. The existing BMS at YGT is operated via legacy trend controls that require an upgrade and enhancement to improve system performance, reliability and integration with existing building services infrastructure. The upgrade to the Honeywell CPO controllers will support backlog maintenance priorities, improve energy efficiency and ensure continued compliance with NHS Wales estates and operational standards. The BMS system is a closed protocol system and the upgrade can only be undertaken by the Original Equipment Manufacturer (OEM), Honeywell Building Solutions.

CPV: 45351000

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe