Tenderfy

Battery Storage DNO grid upgrade

Hankija
Mining Remediation Authority
Avaldatud
2026-10-30
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

This contract is for grid upgrade works at Bates MWTS to enable the connection to the grid of the battery energy storage system that is to be installed during FY 2026/27. These works fall under non-contestable works, which means that the works must be completed by the Distribution Network Operator (DNO), in this instance that is Northern Powergrid.

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe