Off Site Energy Capacity Upgrade Aether
- Hankija
- Atomic Weapons Establishment
- Avaldatud
- 2026-10-29
- Tähtaeg
- Pole esitatud
- Allikad
- UK_FTS
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
Infrastructure programme for offsite electrical capacity requirements across the Aldermaston and Burghfield sites. The requirement includes offsite connectivity for items including new electricity network connections, substations, transformers, cable infrastructure, protection systems, transmission interfaces and associated network modifications.
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe