Tenderfy

Expansion and Repair of Recycling Facilities

Hankija
Stoke on Trent City Council
Avaldatud
2026-10-29
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

The existing recycling facilities lack sufficient capacity to cope with the quantity of material being transferred to the site from bulky waste and fly tipping collections. Therefore to meet demand, extra capacity needs to be created by enlarging the recycling facilities. The works involve modifications to and integration with existing infrastructure including site layouts, operational constraints, drainage arrangements, environmental controls and material processing operations.

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe