Flexible Advanced Industrial Unit (Design and Build) – Phase 2 of i3 Business Park
- Hankija
- North Ayrshire Council
- Avaldatud
- 2026-10-26
- Tähtaeg
- Pole esitatud
- Allikad
- UK_FTS
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
North Ayrshire Council require to appoint a suitably experienced and qualified contractor to carry out the design and build of a flexible Advanced Industrial Unit as part of Phase 2 of the investment by the Ayrshire Growth Deal and local regeneration fund in the i3 Business Park.
CPV: 45000000, 45210000, 45211350, 45213100, 45213200, 45213250, 45213251
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe