Tenderfy

Bore Holes, Trial Pits and Trenches at PVBP

Hankija
Bolsover District Council
Avaldatud
2026-10-26
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

Removal of silt from the top end of culvert one, use of high pressure jetting hose and hydraulic pumps for a period of up to 10 days Provision of structural and geotechnical site investigations at Pleasley Vale Mills to support the assessment and design of repairs to the mill buildings, culverts and associated infrastructure. Works include intrusive ground investigations, boreholes, trial pits, structural coring of culvert walls and foundations, geotechnical and laboratory testing, groundwater monitoring, and the preparation of factual structural and ground investigation reports.

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe