Fiennes FY24050 - DDA Compliant Airlock Works
- Hankija
- Oxford Health NHS Foundation Trust
- Avaldatud
- 2026-10-28
- Tähtaeg
- Pole esitatud
- Allikad
- UK_FTS
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
An urgent need of modification to the airlock at Fiennes Banbury to meet DDA compliance as there have been several incidents affecting those with mobility issues accessing the airlock, reception and waiting area at Fiennes Banbury. The same contractor needs to be used so warranty is not affected as this is a recently completed project (April 2026).
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe