COM 09 Floating Turbine Towing Challenges
- Hankija
- ORE Catapult
- Avaldatud
- 2026-10-22
- Tähtaeg
- Pole esitatud
- Allikad
- UK_FTS
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
The contractor is expected to fulfil two main scopes of service: 1.Creation of a detailed towing and hook-up study based on a reference case provided by ORE Catapult in consultation with our FOW CoE partners. 2.Provision of consultancy services to assist with the development and delivery of work scopes undertaken by ORE Catapult.
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe