Tenderfy

3m³ Box Design Optimisation and Development

Hankija
Sellafield Limited
Avaldatud
2026-10-21
Tähtaeg
Pole esitatud
Allikad
UK_FTS
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

The contract covers engineering development, testing and validation activities to support the ongoing optimisation of the existing 3m³ box design currently utilised within the live manufacturing environment, including: • Development and validation of methods to support refurbishment and reuse activities • Design and testing of enhanced base configurations to support long term performance • Development of an alternative reduced height bund configuration to improve operability and process efficiency • Testing and verification of proposed improvements • Preparation of supporting manufacturing instructions and technical documentation to enable controlled implementation This activity relates solely to the existing production design and supports ongoing product and process optimisation within the live manufacturing environment.

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe