Oxford Street - Permanent scheme engineering services
- Hankija
- Oxford Street Development Corporation
- Avaldatud
- 2026-10-19
- Tähtaeg
- Pole esitatud
- Allikad
- UK_FTS
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
A multi-disciplinary engineer team is sought to support the design of the permanent scheme of the Oxford Street Transformation Project (OSTP). During the project period covering RIBA stages 2 and 3, the engineer will be required to work alongside the design team (East) to develop a concept and coordinated design, after which a period of coordination with TfL and then review of RIBA 4 detailed design (by others) will be required.
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe