School Sustainable Drainage Phase 4 Penshurst Primary School
- Hankija
- East Riding of Yorkshire Council
- Avaldatud
- 2026-10-15
- Tähtaeg
- 2026-07-08T11:00:00+00:00
- Allikad
- UK_CF
- Väärtus
- 85117.0 GBP
Kirjeldus
Kirjeldus on allika keeles.
To retrofit Penshurst Primary School with Sustainable Drainage methods to reduce flood risk to the school buildings and attenuate surface water before entering the existing Yorkshire Water system.
CPV: 45000000
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe