CHC Elektrolyse JadeWeser - PreQualification
- Hankija
- VERBUND Business Solution GmbH
- Avaldatud
- 2026-11-11
- Tähtaeg
- 2026-11-23T09:00:00+00:00
- Allikad
- TED
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
EWE HYDROGEN GmbH and VERBUND GREEN HYDROGEN GmbH intend to establish and operate a modular 200 MW electrolysis plant as part of a joint venture. Operating at around 5.000 full-load hours, the plant can produce up to 17.600 t/a of green H2 from renewable electricity (RED II) and feed it into the H2Coastlink 5 pipeline. This tender covers the prequalification for the upcoming EPC-tender.
CPV: 24111000, 42500000, 45250000, 71300000
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe