Universal design - Oslo S - turnkey contract with interaction.
- Hankija
- Bane NOR SF
- Avaldatud
- 2026-11-03
- Tähtaeg
- Pole esitatud
- Allikad
- TED
- Väärtus
- Pole esitatud
Kirjeldus
Kirjeldus on allika keeles.
The most important measures shall include: - increase the platform height to 760 mm above the track top (SOK) - lift connection between the footpath and all platforms - snow melting system and improved line drainage on platforms - system for signage, guiding lines, tactile fields and stairway systems - improved lighting and customer information - establish track loops between tracks 17 and 18
CPV: 45000000
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.
Loe