Tenderfy

Universal design - Oslo S - turnkey contract with interaction.

Hankija
Bane NOR SF
Avaldatud
2026-11-03
Tähtaeg
Pole esitatud
Allikad
TED
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

The most important measures shall include: - increase the platform height to 760 mm above the track top (SOK) - lift connection between the footpath and all platforms - snow melting system and improved line drainage on platforms - system for signage, guiding lines, tactile fields and stairway systems - improved lighting and customer information - establish track loops between tracks 17 and 18

CPV: 45000000

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe